Cyber Essentials Certified ISO 27001 Aligned Unlimited Shop-Floor Users Made in Sheffield

MRP Software For UK Precision Manufacturers

Know what you need to buy, what you can make with the people and machines available, and which orders are at risk. Keystone connects planning, shop-floor activity, quality and actual job cost in one system made and supported in Sheffield.

Book A Product WalkthroughExplore How Keystone Works

Keystone dashboard showing orders, revenue, delivery performance, quality issues and machine status
Select the image to view it full size.
For Factories of 25 to 150 peopleOff the spreadsheets, into one recordUnlimited shop-floor usersMade in Sheffield
Keystone shop-floor terminal showing the current job, machine status, quantities and operator booking controls
Demonstration data.

A Paperless Shop Floor

Less Paperwork. More Production.

Give operators job information on screen and record time, completed quantities and scrap at the terminal. Reduce printed job sheets, handwritten updates and retyping in the office.

Explore Shop-Floor Working

Plan The Work Your Factory Can Actually Deliver

Connect customer orders, materials, available people and machine capacity. Follow each job through production, quality and despatch, with actual cost and the records behind every decision.

CNC-01
op 20unattended
CNC-02
op 10op 10

Plan Machines And People Together

Work centre calendars narrowed to the hours somebody is rostered, with unattended running counted separately and conflicts shown before the week starts.

See production planning

Illustrative · synthetic data
Published
revision 3
Confirmed
62%

Behind

Compare The Agreed Plan With Actual Progress

Publish a plan and follow confirmed progress against it. A job running late shows as slippage rather than quietly moving every commitment behind it.

See published plans

Illustrative · synthetic data
11.95012.01812.050

Keep Quality Evidence With The Job

A measured result against its tolerance, the instrument it was measured with, and the calibration that stood on the day, kept on the record that released the parts.

See quality and traceability

Illustrative · synthetic data

Follow A Single Order Through The System

The same order, seen at six points between the customer asking for it and the margin being known. This is a demonstration using fictional orders, parts and customers.

Sales order SO-2026-1844 in Keystone, showing the customer, two order lines including 240 off the motor mounting bracket, and the required date of 9 October 2026

1.

Customer order

Sales order SO-2026-1844 — 600 units across two lines, 240 of them the motor mounting bracket, required 9 October. The promise date every later decision is measured against, and the delivery risk banner naming what threatens it.

Material availability panel showing a 304 stainless sheet shortage pegged to works order WO-10453, 11.37 needed against 6 on hand, and a replenishment purchase order nine days late

2.

Material requirement

MRP nets the order against free stock and raises a buy recommendation. Eleven sheets of 3mm 304 stainless are needed and six are on hand. Keystone shows the shortage, the works order it belongs to, and the replenishment order that is nine days late.

Finite capacity planning board showing operations placed on work centres across a two-week timeline, with setup, running and waiting states and a job pool

3.

Schedule

Operations are placed on work centres across the horizon, with set-up and run distinguished and anything waiting on material or tooling held in the job pool rather than dropped on a machine that cannot start it.

Shop-floor booking screen for works order WO-10452 at CNC Mill 01, showing the operator signed in, 124 of 240 completed and 3 scrapped

4.

Shop-floor booking

The operator signs in at the machine and books against the works order. 124 of 240 made, three scrapped, operation 3 of 10 — visible while the job is still running, not after it has shipped.

Quality control inspection queue showing first-off, in-process, final and goods-in checks against works orders, with inspector and due date

5.

Quality

Inspection is queued against the job, not kept in a separate folder. The in-process check on WO-10452 names the revision, the quantity presented and the inspector who signed it.

Job cost summary for works order WO-10452 showing material, labour and machine time, subcontract and overhead booked against the job, compared with standard cost for the quantity

6.

Actual margin

Material, labour and machine time, subcontract and overhead, booked against the job while it runs rather than totted up after it ships. £19,454 booked to date against a standard cost of £51,480 for the full 240, so the next quotation for this part starts from what the work actually took.

Two more questions come up every week. Which jobs are waiting for inspection or subcontract work? and what did that job actually cost? Both have a page of their own.

Production planning

Every Work Centre And The Jobs Assigned To It

Live machine state across the factory floor, each machine showing the works order it is running, the operator, cycle time against target and OEE
Demonstration data.

Answers For The Decisions That Shape The Day

Keystone connects demand, materials, capacity, production, quality and cost so each answer comes from the same live record.

Today — four work centres06:00 to 22:00
CNC-01
WO-2210 op 20op 30 unattended
CNC-02
WO-2237 op 10WO-2241 op 10
MILL-03
WO-2233 op 40
GRIND-04
WO-2228 op 60
06:0010:0014:0018:0022:00

CNC-02 is double-booked. Two operations want the same machine at the same time, and the plan says so before the week starts rather than on the morning it matters.

Illustrative · synthetic data

Which Of Your Orders Will Miss Its Date?

Keystone compares the promised date against the works order, the operations booked so far, the material still outstanding and any inspection holding the job. It returns the list, not a percentage. See production planning.

What Do You Need To Buy, And By When?

An MRP run nets accepted demand against stock, open production, issued purchase orders and requisitions, week by week. Every recommendation names the order behind it, so you can see why it wants you to buy. See material requirements planning.

See Overloaded Work Centres And Uncovered Shifts

The plan loads work centres against their calendars, then narrows each one to the hours somebody is rostered to that machine. Unattended running is counted separately, so a machine with no operator on it shows up before the week starts. See finite production planning.

Two more questions come up every week. Which jobs are waiting for inspection or subcontract work? and what did that job actually cost? Both have a page of their own.

Connected Factory

Machine Performance Linked To The Order It Affects

We install a small collector unit on your network. It reads machine state and ties each reading to the works order that was running. When a machine stops for four hours, you see which works order was running and assess the impact on its customer order.

Collection only reads: nothing in Keystone can start, stop or change a machine. What a control exposes varies by its age and interface, so we confirm what we can read from your machines before you commit.

What The Collector Reads

A connected machine showing its recorded state and utilisation alongside the works order that was running
Connected machine.

Keystone AI

Factory Intelligence That Identifies Risks Early

Factory Watch checks manufacturing records on a schedule and links each finding to the records behind it. Your team decides what action to take. Factory Watch checks eight areas of the factory record on a schedule: commercial, planning, materials, production, quality, machines, people and despatch. Each finding names the records behind it, carries a priority and an owner, and can be acknowledged, snoozed or actioned.

How Factory Watch Works

Factory Watch showing eight checked domains with critical and concern states, and a briefing naming a works order running four days behind
Factory Watch.

Implementation

Implementation Led From Sheffield

There is no client software to install on office machines or shop-floor terminals.

We begin with on-site discovery, then configure the system, import and validate your data, train each team and move to a controlled go-live. The plan is prepared after discovery, so it reflects the state of your data, the connections you need and the number of sites.

Keystone runs manufacturing operations. The ledger stays where it is, telemetry stays read-only, and CAD and CAM stay in the tools your engineers already use.

How An Implementation Runs

See Keystone Precision With Your Manufacturing Workflow

A tailored walkthrough follows one of your jobs from customer demand through planning, production, quality and despatch.

Book A WalkthroughSee Pricing

£595

a month for Core. Prices for the three standard packages are published. Enterprise is quoted separately.

Unlimited

shop-floor users on every plan. Booking on to a job never counts against the office allowance.

25–150

the size of factory Keystone is built for, and the size we have designed every screen around.